MAXDATA SN 40 M1 Instrucciones de operaciones Pagina 43

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 80
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 42
Commissioning
43
!
Note!
Relays not included in alternating pump control are available.
This function cannot be applied to individual relays. Relays not included are not assessed based
on the switch-on and switch-off duration.
The following parameters must be configured for the example above:
24-hour activation function
Pumps with long downtimes can be activated cyclically with the 24-hour activation function for
the time (0 to 999 sec) defined in Sw. period.
The starting time for the 24-hour step interval can be postponed by 0 to 23 hours with the Sw.
delay setting.
G09-RIA452ZZ-15-00-xx-en-009
Fig. 20: 24-hour activation function
Example: time at the time of configuration 12 midday, desired start of 24-hour counting 22:00
(10 p.m.) set Sw. delay to 10.
!
Note!
If power is switched off, the time for the 24-hour activation function starts again.
The following parameters must be configured for the example above:
Menu Function (menu item) Setting value
LIMIT 1 to 3/M10 to 12 Each: setpoint A
Each: hysteresis
Each: alternate
Value for threshold
Value for hysteresis
Yes
Menu Function (menu item) Setting value
LIMIT Sw. period
Sw. delay
Activation duration
Activation delay
Vista de pagina 42
1 2 ... 38 39 40 41 42 43 44 45 46 47 48 ... 79 80

Comentarios a estos manuales

Sin comentarios